Implementation

Implementation is performed in compliance with the plan developed in the requirement analysis and planning phase. Exhaustive production environment testing may be required. Configuration items are maintained as outlined by the implementation plan and maintained by the project librarian.

Quality activities such as versioning and configuration management are continued to ensure a robust and welldocumented implementation.

Tasks

There are many activities performed in support of the core implementation tasks. These support activities are defined in the Implementation and External Interfaces document and also in the Project Plan. The core tasks of the implementation phase include:

  • Installation
  • Production data conversion
  • Parallel run (if applicable)
  • Live cut run

Implementation is performed in compliance with the plan developed during the Design Phase. Exhaustive testing of the production environment is required. Minor system adjustments and refinements are made during this phase.

Deliverables

  • Integrated System (with necessary data)
  • Post Implementation Review Report

Quality

Implementation is performed per the plan developed in the design phase. Exhaustive testing of the production environment may be required. Minor system adjustments and refinements are made during the implementation phase. Configuration management is maintained as outlined by the implementation plan and maintained by the project librarian.