Implementation
Implementation is performed in compliance with the plan
developed in the requirement analysis and planning phase.
Exhaustive production environment testing may be required.
Configuration items are maintained as outlined by the
implementation plan and maintained by the project librarian.
Quality activities such as versioning and configuration
management are continued to ensure a robust and welldocumented
implementation.
Tasks
There are many activities performed in support of the core
implementation tasks. These support activities are defined in the
Implementation and External Interfaces document and also in the
Project Plan. The core tasks of the implementation phase include:
- Installation
- Production data conversion
- Parallel run (if applicable)
- Live cut run
Implementation is performed in compliance with the plan
developed during the Design Phase. Exhaustive testing of the
production environment is required. Minor system adjustments
and refinements are made during this phase.
Deliverables
- Integrated System (with necessary data)
- Post Implementation Review Report
Quality
Implementation is performed per the plan developed in the design
phase. Exhaustive testing of the production environment may be
required. Minor system adjustments and refinements are made
during the implementation phase. Configuration management is
maintained as outlined by the implementation plan and
maintained by the project librarian.